NUSENDA

New Roof

NRC installed both a TPO membrane system and a Standing Seam Metal Roof on this new construction. 

NRC installed both a TPO membrane system and a Standing Seam Metal Roof on this new construction.  In the construction of the metal roof, four inches of rigid Iso insulation was fastened to the metal deck prior to the installation of 24 gage Sheffield 18-inch Standing Seam Metal Roof panels and flashings.  When assembling the TPO membrane roofing system, a base layer of PolyIso insulation was securely fastened before the 60 mil white TPO was attached using the Firestone InvisiWeld method.  The TPO membrane was adhered up the parapet walls a minimum of 8 inches before terminating with a counterflashing. 